how many days we should curing for
plastering,brickwork,concrete?

Answer Posted / senthil kumar p

Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound

Is This Answer Correct ?    115 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1490


Why is the statue of liberty made of copper?

656


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

1899


WHAT DLC DESIGN IN CONSTRUCTION

1648


What is need for setting limits?

653






what are the challenges of being a team leader and a supervisor?

3343


What is the effect of a building collapse?

625


how to calibrate the RM 800

1855


sir please send me campus placement questions in civil engineering

3131


questions with answers to face an interview of an civil engineer regarding RCC buidings

2161


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1238


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1829


how many shuttering material required for 1000 sq.m built up area.

1877


How to build the floor to ceiling bookcase?

824


why we use aggregate,sand with cement in concrete?

8115