1 building project (work in progress) and following are sum
detail about his project
1) Using local rebar grade 415
2) Total built up area- 60000 sq.ft
3) Floors to be constructed – 21 storey
4) Estimated requirement of Steel per sq. foot –
7KG/sq.ft
5) Concrete grade – M35
6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm
for stirrups)
Wanted to ask u if this person uses 500D…what are the
benefits he will be getting? Whether his per Sq. foot
consumption can b reduce? If yes den around how much?
Answer Posted / wicked_dipen
plz ny1 help me in finding this answer
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
what motivates you to do a good job
Mention different types of roof systems?
calculate the quantity of water for 1:6 cement mortar
How to calculate volume of concrete & steel on tank foundation & ring wall ?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
why the openings of sieves are square io size?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What Are The Different Type Of Slump Test Indications?
how much required strength of cement concrete bricks(size 230x115x75mm)
How can explode a block?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?