What is the meaning of RCC NP3 Pipes

Answer Posted / suhas poria

RCC NP3 pipe means Non Pressure Hume pipe made with
reinforcement cement concrete. It stands in class 3. It is
medium duty pipe. it is used for irigation and culvert with
medium traffic density.Other classification is NP1
(Concrete non pressure pipe with no reinforcement), NP2 (
It is light duty), NP4 (it is heavy duty.You can refer
IS:458-1988 for further details information.

Is This Answer Correct ?    129 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1552


what is thumb rule for calculating the size of ISMB required for a particular length of span

2957


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1499


how many type of admixtures for water stored structure?

1719


what are the proper pipes for salt water line

1865






what is the list of building construction equipment & teir output?

1696


what is floating slab foundation?

673


how to calibrate the RM 800

1858


which method is used in semi-rigid connection design??

1803


1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2312


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

1911


What are the different softwares used for cad?

724


What is the density of most of construction materials?

732


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

1954


What are the main reasons for conducting pull-out tests for soil nails?

725