Answer Posted / suhas poria
RCC NP3 pipe means Non Pressure Hume pipe made with
reinforcement cement concrete. It stands in class 3. It is
medium duty pipe. it is used for irigation and culvert with
medium traffic density.Other classification is NP1
(Concrete non pressure pipe with no reinforcement), NP2 (
It is light duty), NP4 (it is heavy duty.You can refer
IS:458-1988 for further details information.
| Is This Answer Correct ? | 129 Yes | 6 No |
Post New Answer View All Answers
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
what course did you consider thinking before you enrolled in college?
What is the diff between cad & cadd?
Why is the statue of liberty made of copper?
What is the difference between linear dimension and aligned dimension?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What Reinforcements Are Used In The Process Of Prestressing?
what is the type of earthing
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
afe or not
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Which are the top apps for you civil engineering?
what is the formula to find the diagonal shape stirrups?