how can u say about the line by looking at the tower ?
{voltage rating of the line}

Answer Posted / ujjwol

Just like the other people said, counting the number of insulator will give you the idea of voltage level of the line. If there are 6 insulators, it is basically 66 kV and if there are 9 insulators, its 132 kV and so. If the tower has horizontal configuration , then u can almost predict that the voltage level exceeds 200 kV. It is because horizontal towers are used for voltages exceeding 132 kV ,to reduce the height of tower.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to define Kirchhoff current law and voltage law along with simply examples.

1216


why we not used 11kva as a direct our electrnics component.

2339


what is meaning of 230volts ac 50hzs ac supply is it rms or maximum to getting ac 230v what amount of max voltage they will send

1540


how can i determine the gear ratio for a rack and pinion system if an electronic gate operated by an electric motor is to travel a distance of 5meters in 15 seconds.

1621


Difference between rating factor of cable and derating factor of cable?

1180






is all the servo motors having brake?please specify which servo motors having brake for stop on position and which are not.

1313


An active element is one which a. Supplies energy b. Absorbs energy c. Supplies energy and convert energy from one form to another

1635


how to read idmt curva

1712


what material is used in capaciter

1465


Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1438


Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.

1647


How to connect the chemical earthing and complete process tell me plz

1387


wish of these transformer uses oil?

1161


What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?

1753


I am a electrical engg. diploma holder,applied for junior engineer (electrical),Kolkata RRB. Have I to attend all electrical,mechanical&civil portion in written exam.???

15186