At which time Synchronous generator act as a Synchronous
Condenser?
Answer Posted / praadeep_dd@yahoo.com
At peak load time Synchronous Gen. act as Synchronous
condenser. At peak load time the p.f. is very poor resulting
in low vtg at receiving end. Hence to feed reactive power to
inductive load the Synchronous Gen. is over excited. This
improves p.f. improving vts profile at R.E.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Name the types of motors used in vacuum cleaners, phonographic appliances, vending machines,refrigerators, rolling mills, lathes, power factor improvement and cranes.
The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.
we can run 2phase as 3phase .what will be the differnce with respect to phase angle, power, current between the two modes
How can we find the breaking capacity of a Load breaker switch (LBS) fed from 11 kv supply??ex:50KA, 26kA etc???detailed step vice answer pls.
how was your last weekend.
i have flexible wire. size of conductors is 0.190 mm & no.of conductors are 48. then size of wire comes 1.37 sqmm instead of 1.5 sqmm . the what is tolerance for this size.
What is an order of a system.
bsnl tta exam question
I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.
CALCULATE THE TOTAL VOLTAGE DROP AND SELECT THE CABLE SIZE IN MM-SQARE FOR A PANEL-262KW AT 110 METER FROM THE SOURCE SUPPLY , SUPPLY VOLTAGE 240/415
Explain the operation of variable frequency transformer?
What are the main faults of DC generators?
Explain and give examples about VCB?
How to know any size of cable if there are not written on cable? Answer must be theurical not by experience.
what reactive how to maintain