Answer Posted / mm
If we are talking about teh motor it self, then check teh
following,
1) while rotaing the shaft, the movement must be free and
there is no abnormal sound. It ensure that bearings are
fitted properly and rotor shaft is aligned.
2) Second check there is any play in the shaft by pushing
it forward backword or up-down. It will ensure that the
bearing housing is ok.
Then your motor is ready for installtion.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.
What is an iron loss or core loss pi?
what is the working process of over & under voltage relay.
why the perameters of secondary circuit are more important then that of the primary circuit of induction motor?
What happens if we give the supply to the rotor of induction motor and make its terminal shorted?
I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?
WHAT IS MOBILE SUB-STATION? & REALLY BENEFIT IN INDIA
What is the use for cable entry in control room?
what is the difference between active power and reactive power and apparant power in practical as well as theoritical
What is genrally the % Impedance of a Dg set? How can we calculate Earthing conductor size for a DG set?
WHY MOSTLY Rph IS USED FOR CONTROL CIRCUITS AUX. SUPPLY ?
what is d check in dg 1500kva
What does ampere turns shows?
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
If I bring a basic electric meter from the States and hook it up in Costa Rica in a development that has only one transformer for the 50 homes, will it still be accurate regarding the usage of kilowatt hours?