which tap of the transormer you will use in critical
condition(worst)?
Answer Posted / s.k.
For power TR's : 15,20,30,45,75 MVA , they have 21 taps
then the 2dry wdg. should meets the required kV
so , when the tap at the lower step( tap 1), it results the
lower kV at 2dry.
Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
how to produsing geretor power
what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
how to operate and maintenance of 1500 kva diesel generator set
is it possible to have dc motors on single chip
What are the types of excitation system?
Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..
What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.
If a surge divertor is required to be protected by 32 amp C Curve Circuit breaker does this limit the amount of protection from surges that you will acheive
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
What do you mean by passive circuit elements and why these are called passive?
how to calculate sizing of NGTR (Transformer rating,Loading resistor value and Current rating of resistor) and what is the X/R ratio. Details : 11kV,Capacitance 1.73532 micro farads,40kA for 1sec.
checking procedure of capacitor based motors.used in fans etc?
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application