what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?
Answer Posted / suresh
for ex 1 m3 of concrete
conc 1;4;8
cement = 0.45 m3 of mix =1440x0.45/4=162kgs or 3.24 bag
sand = 0.45m3
40mm aggregate = 0.90m3
Is This Answer Correct ? | 22 Yes | 18 No |
Post New Answer View All Answers
punj loyed and sapurjl palanjl
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
What is the meaning of soil reinforcement?
What was asked in isro civil interview
a butt weld is specified by
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the percentage of silt in black cotton soil.?
Explain what is Hybrid Foundation?
what is meant by residual strain?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
Why are steel plates inserted inside bearings in elastomeric bearing?
Types of column foundation and how to calculate its steel quantity.
Material calculation of cm 1:6 for 1sqm
why development length = 50D . why not 100D