why we are placing the beam under the plinth wall?

Answer Posted / dushyant bansal

so that movement of soil due to rain or else may not
produce cracks in the wall.

Is This Answer Correct ?    6 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to estabilish reinforcement Steel rolling margin for a building projects ?

3651


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1633


what else we can add rather than admixture in concrete to reduce the cement quantity?

5324


How do you compute the volume of airflow?

689


what is the types of surveying?which type of survey carrying for type of work?

1677






why we are using stub column..? is it possible to construct steel stub column..?

1522


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1663


I have an span length 16 ft c/c

1067


What is the ideal size of the living room ranges from small to large size?

666


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1285


I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?

1674


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1412


What is the difference between routing maintenance and major maintenance in school facilities?

669


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2103