Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why capacitor bank does not require in DG Set?

Answer Posted / tapan

Increasing p.f shall automatically enhance the Kw demand
then its designed value and the alternator shall not be
able to cater this additional Kw and shall trip due to over
current. Hence it is not recommended to install the
capacitors accross the DG set to increase its p.f more then
its designed value.

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much ph is maintained of water resistance starter for slipring induction motor ?

2412


Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB

2803


What are the components of feedback control system?

1093


grr resistance & contrator malt continuous

2161


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1774


WHY THREE PHESE SYSTEM VOLTAGE APPLIED IN 440 VOLT

2349


what is the purpose of shading ring or shading coil in electrical equipments.

4479


Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.

1786


What is a diode?

1071


DG SET BLOCK DIGRAM

2298


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

1924


what is negative d.c. voltage, why this voltage is used in base transciever station.

2163


Earth leakage relay basic knowledge principle

2191


What is frantic effect?

1276


What are the factors influence the choice of an electrc drive?

2085