Answer Posted / lakshman
splices is nothing but over laps
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Dear Sir What is the Contraction joint for base Slab
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
how to calculate quantity of bricks in circular manhole with examples.
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What is the use of mirror command?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What is the difference between undo & redo?
How many days should curing of plastering, brick work and concrete
at which depth the construction of tunnel is economical from cost and engineering aspect.
What is thumb rule for deep trench excavation
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks