when the demand is more on grid and generation is less frequency get decreased and vise - vers.
so in order to maintain this near to 50hz grid gave a schedule to power generating station of 15-15 min. for 24 hour's in advance ( prediction on the basis of previous records )
satendra.svnit@gmail.com
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How much voltage we need to apply in 33kv cable during hipot test of cable
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.
1.why we are using metal oxide gapless block in lightning arrester,2.What is minimum and maximum rating of metal oxide blocks using in india
What's the difference between non break power supply and non break non short break power supply
what is mean by descripiency relay? & wht is its ansi code?
Define open loop control system.
how can we select the appropriate VCB ?
how to calculate vfd o/p voltage by frequency
How to protect sensitive loads such as Dosing pumps inside a factory from voltage surge/voltage fluctuation.
sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com
Why can't we parallel the secondary circuits of two voltage transformers?
What si the d/f b/w KVA & KWH, kvarh & kvar, kwh & kvar phase voltage & line voltage
new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection
Which Class insulation is prefered for the sandwich Busducts ? Why?
Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.