Answer Posted / ahmed mahmoud
PLC = Programable Logic Control
DCS = Distrbuted Control System
SCADA = Supervisory Control And Data Acquisition
| Is This Answer Correct ? | 23 Yes | 2 No |
Post New Answer View All Answers
hey guys help me out.....what are the industrial uses/functions of nozzles in industries
Please define ampere?
A ii kv 1200 A Breaker combination fixed in a cubicle. How many ampere Fuse is required? If fuse is not using, Why?
Where servomechanism is used?
how technical is calculated in 11kv line and lt line
how external lighting design? please give examples?
IF HT CAPACITOR IN ON POSITION IS THERE ANY LOSSES I.S I SQURE OCCURS IN THE SYSTEM
what is KA rating and how can we choose switchgears on applications
I Have 3 Phase 10 KW AC Alternator i found one phase weak, so what will be the reason & what action shouls i take to rectify the same.
What's the difference between non break power supply and non break non short break power supply
Two bulbs of 100w and 40w respectively connected in series across a 230v supply which bulb will glow bright and why?
How much no load current of synchronous motor
what is Insulation monitoring device. where it is used? (in switchgear room or control panel or in field equipment)
How many kinds of E.L.C.B and how to work E.L.C.B
What is the maximum percentage voltage drop (vd%)for a motor control center