Answer Posted / gurusharan
It is voids present in the material.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
where i can get material costs on weekly basis
What do you mean by bond? What are the different types of bonds?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
residential buildings,mixing of concrete,structural,construction material,site handling.
Which IS Code/American Code applied for coupler test of steel
what is the exact dia of 8swg and 10swg gabion wire
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
any book or article on pumped concrete.
how to calculate the weight of concrete
How to calculate 1 brss for RCC work
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
I have an span length 16 ft c/c
What are the advantages of cad software’s?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
why we use aggregate,sand with cement in concrete?