when turbine trips generator will becomes induction motor or
synchronous motor?
Answer Posted / sudhir singh
on triping the turbine the generator keep runing due to
inertia and have some residual current flowing in it. then
according to law of electomagneti induction that is when a
current carrying conductor is placed in a magnetic field a
force is force is produced dou to which the conductor start
rotating
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How can find thermal state value in relay for calculate thermal overload.
trasnfarmaer core make
IF DISTANCE IS 100METERS B/W AMP.METER AND CURRENT TRANSFORMER WHAT WILL BE AFFECT IN ACCURACY .METER CAN SHOWING ACCURATE CURRENT OR NOT IF NOT WHAT CAN I DO TO GET 100% ACCURACY.
Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?
what could be the RMS value and average value of a 4 phase sine wave?
can anyone give an idea about dia calculation in cold rolling mill
WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
Logic using 1 kV or 1,1 kV grade in house wiring Low voltage cable. Explain/suggest? some use 1kV and some prefer 1.1kV grade insulation low voltage cable why??
How to prepare electrical preventive maintenance plan & shedule of machine tools in manufacturing unit.
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
Why open circuit test of transformers is conducted at rated voltage??Why not any other voltage??
how is working bearing heater?
How to calculate ant test the burden of Current transformer