WHY WE CAN GENERATE POWER IN 3PHASE MODE ONLY NOT IN 4 OR
5PHASE
Answer Posted / eduardo
You are wrong. We can generate power in 4 or 5 phase or more
or even 2 or 1 phase. The reason we generate only 3 phase is
we don´t need 6 wire (1 to go and 1 to back) to carry the
power. We only need 3 wires. This is because if they are 3
and have 120º phase difference, and if the load in all the 3
phases is equal, the sum of the 3 return current is zero. So
we don´t need wires to "carry back" the current. This is
very economic, and are used in all the world.
There are several articles about it in the net. Try search
neutral current.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Earth has zero potential then what would be the neutral potential ?
what is acceptance test in electrical engineering.
I want the details about BHEL company examination.Can anyone able to help me please.
i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
How much voltage we need to apply in 33kv cable during hipot test of cable
How the setting of the vector surge relay shall be calculated when the relay is to be used for Grid islanding application?
draw singleline diagram of star to delta and dol starters
how oil in the MOCB was reduced compared with OCB? what are the features of the MOCB?
I had applied for JE in PSEB, Can you pls send me the Question bank for related to my field
How to design harmonic filter at the project stage without nowing the harmonics levels
which metal is use in shunt
How does cost of generation from hydropower plant compare with other sources of electricity?
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
how braking & making capacity of circuit breaker is calculated?
How can we calculate the transformer rating if the load calculated is 1000KW (11Kv Supply)?