Answer Posted / dushyant bansal
Generally In a prestressed COncrete Girder Stresing is done
using multi pull jacks that can pull all the cables in a
seething pipe. Also jacks are provided on both the ends of
cables and stress is applied to it until it reaches the
specified limit.
Elongation of the cables is also measured to cross check
the tension in the cables.
| Is This Answer Correct ? | 58 Yes | 7 No |
Post New Answer View All Answers
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
Define a polyline?
What materials were used to build the golden gate bridge?
What black man invented the clothes dryer?
what is thumb rule for calculating the size of ISMB required for a particular length of span
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
Aptitude, reasoning, quants, verbal and technical question
How to do base isolation for RC framed structure using ETABS software?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
though u r a civil engineer, y r u interested in tcs???
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How to calculate plastering for elevated water storage tank