Answer Posted / adil nadeem
Bills of quantities is a document prepared while tendering
which includes various items of works involved in a
particular project , right from the site
clearance /excavation upto the completion of the
project. a brief discription of the item is mentioned
along with a tentative quantity , so that the contractor
can understand the scope of work involved in that
particular item and quote the rate accordingly. later after
executing the work the bill of contractor is paid according
to the work executed as described in the bills of quantites.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
undistributed samples are obtained by
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Which IS Code/American Code applied for coupler test of steel
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Explain what is progress payment?
What is command line?
What are the advantages of cad?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Spider cracks occur in beam bottom due to––
How do we test on design and style in a software?