Life of Rcc is taken as 100 years. What will be the life of
structure after 10 years. will the strength of concrete increases or decreases.
Answer Posted / paripurna nand srivastava
exact life can not be decided.After costing RCC infew year
stength increase after that it is decrease.
Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
What is the procedure of concealed plumbing in toilets?
Why are steel plates inserted inside bearings in elastomeric bearing?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is the effect of a building collapse?
hi guys what happens if you are absent for a supplymentry exam?
how much to get of BRC lapping in full yield and half yield ?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
How to design staircase.plz tell me formula for the design the staircase.
How to calculate steel for beam slab and column
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What are the ingredients of pre-stressed concrete?
what is cement wastage percentage in NHAI ROAD WORKS