What is the meaning of RCC NP3 Pipes

Answer Posted / nitesh mangal

There are mainly two different varieties of Reinforced
cement Pipes. They are classified as Class NP2 and Class
NP3 depending on the type of load pressure to withstand.

Is This Answer Correct ?    23 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

1630


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1616


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2343


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1703


what is civil enginnering & what you need of this course?

1799






How much material will consume for following specification water tank (9*7.5*6 feet)?

1629


what is meant by residual strain?

1802


Differentiate first angle & third angle projection?

661


What is the biggest dam in america?

671


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1624


Define What is made from large rocks, which protects the base of cliffs?

665


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1392


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

733


Which IS Code/American Code applied for coupler test of steel

2186