how to choose the cable size for 100A(is there any formula
please update)
Answer Posted / amrish sharma
there is no funda or formula to get size of conductor wrt
to load. just calculate the ampere of the load, and then as
per ampere ,,, as per the cross sectional area of the
conducter like 1.5mmsq can bear the 4-6amp load,,,so on..
Is This Answer Correct ? | 4 Yes | 16 No |
Post New Answer View All Answers
what mean by analog ,digital,numerical meters and relays? say the example?
why the active power flow of some line is increased when the active power of out is cut ?
How to calculate Air conditioning capacity for a telecom BTS shelter?
how can i determine the gear ratio for a rack and pinion system if an electronic gate operated by an electric motor is to travel a distance of 5meters in 15 seconds.
What are the internal and external faults?
What magnetic circuit is formed in berry-type constructions and why?
HOW TO CALCULATE THE VT SIZING?
EXPLAIN THE WORKING OF SERIES REACTOR IN HT CAPACITOR BANKS (FOR VOLTAGES & CURRENTS)
I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com
Why star delta starter is preferred with induction motor?
I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
Why do we need interlocking in a HT metering or Ring main unit switchgear?
c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron