Part time jobs for engineer students working or studying

Answer Posted / dhanashree

Part time job for engg. student is studying experiance . It
gives lot of knwoledge both theroticaly & practically.

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the method adopted to minimize shell side pressure drop in a shell?

606


Explain what are the design considerations for a piping system for the transfer of slurries?

545


marketing procedure of iocl

1936


PLEASE ANY ONE READ THIS MESSAGE ANSWER ME AT MY EMAIL ID surendrasaroj18@gmail.com sir i am prepairing for section engineer exam taken by railway my branch is chemical engineering i want previous paper of chemical engineering of section engineer exam taken by railway. please answer me as soon as possible thankyou

1602


How fouling effected the heat transfer rate?

664






How to size the cooling tower sump / basin for any given circulation rate? What is the guideline?

2632


What are some common problems associated with dilute phase pneumatic conveying?

639


Should slurry pipes be sloped during horizontal runs?

598


Why whenever a reciprocating compressor is switched ON or OFF it is put into unloading mode?

1547


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

1804


How instrument air is continually supplied in process plant?

671


What is the most common cause of solid size segregation in bulk solid systems?

1916


hi sir/madam i need placement paper of last years of DRDO in chemical sream...... send me the question paper as soon as possible on my email address praveen.zone@gmail.com

2348


What types of metals are typically removed via chemical precipitation?

605


sir, kindly explain to me that how to calculate volume of torrispherical vessel which is used in pharma company ss reactor bottom dish volume. thank u.

2134