What should be percentage of silt content in sand?
Answer Posted / babu.a
What is the IS code
| Is This Answer Correct ? | 16 Yes | 8 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
how can we construct building without foundation providing only grade beam at ground level
acceptance criteria for concrete works
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How to arrive dry volume of concrete (1.52 to 1.57) ?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is moment-curvature relationship in semi rigid connections??
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
as per is code, what is the minimum content of opc and ppc cement for rcc structure
how to caliculate required amount of cement and sand required for 1cu.m.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering