tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4
Answer Posted / kailash
1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.
Is This Answer Correct ? | 10 Yes | 10 No |
Post New Answer View All Answers
Define a polyline?
How do you measure water flowing through 300mm diameter pipes?
Define Workability ?
Define What happens to Load at yielding ?
how to create our resume?
Questions related to civil.engg in company
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what is right & short method of measurement of slab&beam
What are the different types of civil engineering?
What is 1/8 on the architect ruler denotes?
Explain the design for rcc multi-storied building?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Define absolute co-ordinates?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
hi guys what happens if you are absent for a supplymentry exam?