tell me quantitys of matal, sand and cement in 1:4:8 and
1:2:4

Answer Posted / kailash

1:2:4 & 1:4:8 its not a standard design. design depends
upon the which aggregate available at site and there
density.

Is This Answer Correct ?    10 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define a polyline?

679


How do you measure water flowing through 300mm diameter pipes?

703


Define Workability ?

785


Define What happens to Load at yielding ?

1323


how to create our resume?

1657






Questions related to civil.engg in company

1572


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1499


what is right & short method of measurement of slab&beam

1578


What are the different types of civil engineering?

643


What is 1/8 on the architect ruler denotes?

643


Explain the design for rcc multi-storied building?

695


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

636


Define absolute co-ordinates?

747


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2032


hi guys what happens if you are absent for a supplymentry exam?

1375