Answer Posted / anoop didwnaiya
h/3 above floor & h/3 below slab.
ex- if h=4mtr. then 1.33 above floor & 1.33 below slab.
Is This Answer Correct ? | 37 Yes | 4 No |
Post New Answer View All Answers
How to find beam R/F cutting length
why do we provide haunches in rcc box or underpasses?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
what is castigliano theaorem
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is semirigid connections?
Define What materials were used to build the Golden Gate Bridge?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
What is the meaning of a blue land surveyors flag?
How much cement will require for 1Rmt Skirting laying
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how we check the thickness and line of ceiling plaster.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??