railway exam in asst loco pilot
old test paper

Answer Posted / shyamsunder

yes

Is This Answer Correct ?    10 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Metal covered multiconductor cables shall employ a marker tape located within the cable running for its complete length in lieu of cable surface marking. Is it true or false?

1744


WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.

2176


While testing a ZCT what parameters have to check or measure?

1899


How to calculate cable size in HT AND LT

1518


Hi I'm doing my MBA(3rd semester).I applied for the post of ET conducted by BHEL the last year.I cleared the written and lost in personal interview.Again I wrote the exam this time and cleared the written n yet to take the personal interview.Shall I disclose in the interview about my studies.What shall i say if they ask about my change from studies to job

1649






what is the Transformer Impedence?How can calculate?

1466


diff b/w elcb and rccb

1844


What is Load sharing of Transformer ?

1554


state the disadvantages of carbon filament???

2377


1.25 kg of hydrogen are burnt with stiochiometric air, the mass of air in kg required is

1464


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

9888


Do u know any one? how to find out in motor rated amps? formula?

1546


In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?

1531


dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour

1516


Can you explain about Restricited earth fault protection scheme

1412