why dead weight tester called dead weight tester.
Answer Posted / saparihar
In dead weight tester,
we put the weight on the weight stand of dead weight tester
putting weight is reference weight which is to be calibrate
and further we applied pressure by moving piston ,when
applied pressure and reference weight(Pressure)is equal at
this condition reference weight willbe zero(Dead).
therefore it is called dead weigh tester.
| Is This Answer Correct ? | 34 Yes | 4 No |
Post New Answer View All Answers
List three types Level Switches with their working principles
the pump holds on run indication into the dcs and filed local control panel remote push button condition operaton wrong like when the push button pushing conditions the pump is off and the push button release condition the pump is on totally opposite condition . And control room inside give the stop command into dcs just 1secon relay engage and again normal condition. How can I slove
we have level transmitter for h2s04 storage tank capacity 10k ,always there are failure of transmitter due to failure of magnetic floats ,please come up with solutions at the earliest.
Do you have reference list?
What are primary elements of measuring pressure?
What is Predictive Maintenance
How many interlocks at turbine? Plz explain briefly
What is the procedure of calibration of Load cell?
Can Any body tell me about the Contact or Email id of any good Consultancy which help me to find a job in Instrumentation Field in India .I have Six years of Work Experience in the Same field.Please revert me back on shammi_gwalior@yahoo.com ?
why any measurement made interms of pressure is more accurate ? to be more precise most of the flow velocity is made interms of pressure and it is accurate. what is the reason behind pressure measurement being accurate ?
Which language of programing is popular? how can i learn it ?
What is the right procedure for adjusting the gap voltage of bently nevada vibration sensor?
How is PH sensor works ?
Explain PID controller tuning & any one method used for it.
Isometric drawings are generated during _________________ phase of a project