beam top main reinforcement(25mm) was drilled off by
mistakely when making drill hole for dummy columns. any one
can give useful information for this issue or related code
or websites.
Answer Posted / jamgobi
i have planned to chip both side of concrete to give 1250
mm ,25mm for lablength.
Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
what discoveries did you have in relation to your course?
What is the crank length in the slab?
What are the main reasons for conducting pull-out tests for soil nails?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
How many axes do cartesian coordinate system has?
What is a projection line?
How to calculate laplength for 3 floors
What is Heavy Concrete & Normal Concrete
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
how we calculate the grade of the Bituminous materials.?????
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
I want to join bhel because