whether earth to the height of 80cm could be filled in the
basement inm place of jamuna sand
Answer Posted / kamesh
can u explain about jamuna sand?
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What do you mean by the word 'shear'?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Design a rectangular channel.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Why are steel plates inserted inside bearings in elastomeric bearing?
What is the basic difference between OPC
why we create short columns under grade slab?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
In jack arch floor, the rise is kept?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)