Answer Posted / lekhani dasanayake
a pile can be loosely defined as a column inserted in the
ground to transmit the structual loads to a lower level of
subsoil. classification
1.end bearing
2. friction
displacement piles
1.timber pile
2.precast concrete piles
3.preformed concrete piles
4.steel performed piles
5.composite piles
replacement piles
1.percusion bored piles
2.rotary bored piles
3.prestcore piles
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to get MEP technical,instaaltion & testing data for interview?
What is meant by a context menu in a cad software?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how to calculate the length diamond shaped striupps in column
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
how many time use of plywood shuttering and IS code
how much cement sand n bricks required in im3?and how much in plaster?
What will you do if a portion of load bearing wall collapses under your supervision?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Define current ucs?
what do you understand by M25 concrete
2. What are the advantages of your present job, things you like about it?
What are the techniques to measure road difference?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what does the grad of cement shows (denotes)?