Answer Posted / n.rajeev d.c.e
2.5 tonnes/cum
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is rolling stock
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
how much cement and sand required for 1cum rr masonry
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
I am called for interview from north east power plant .so, I need some interview question which may help me.
Wat is meant by Aecron brick?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Why is concrete cube test carried out?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is meant by residual strain?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What will be weight of 0.5mm GI sheet per sq.ft?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is thumb rule in quantity and cost estimation of a residential building?