what's the reson that,Load is not same on VFD I/P and O/P
Side.whenever DOL condition load is same I/P and O/P side.

Answer Posted / sindhejs

We know that Power out=Torque*speed in rps.
Since in DOL condition there is no speed changing means no
change in power out,while in VFD there will be speed
changing using the frequency control,so the power out
changes from power input in VFD(Assuming that torque is
constant).

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I'm generating a pulse of 3V with frequency 80Hz (12.5ms time period) and pulse duration 0.125ms and feeding it to a transformer since i want the pulse to get amplified around 60V. At the output amplification s happening but the pulse is changed to a spike, can you tell me what could be the reason? (an ordinary transformer 220V-12V stepdown transformer is reverse connected ie. now it is 12V-220V stepup and voltage amplification happens)

1459


how r charge carriers produced

1642


Draw the single line diagram of the power station?

663


What is the emf equation of a transformer?

683


WHAT IS MOBILE SUB-STATION? & REALLY BENEFIT IN INDIA

1594






How to calculate pitch, gauge of winding wire, and No. of turns for 30HP, 3 phase, 4 poles 50Hz, 380V induction motors

1483


Explain what is use of lockout relay in ht voltage?

683


Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007

1411


how to measure the current by compact digital equipment with dislay which fit inside any equipment

1479


How to select, design,size & calculate for 11 KV/33KV/66KV/132KV/220 KV/440 KV circuit breaker for HT side of transformer protection/HT distribution protection?

2305


Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?

1264


what is kondo syatem in eletrical traction

1674


In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.

1643


What is difference between SMC supportg and Glass Fibre Reinforced Plastic Support.

1867


Which type of DG need Netral Earthing?

4527