HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.

Answer Posted / naresh

.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor

Is This Answer Correct ?    22 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to find out kg per Sft ?

1804


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

1855


what is pile and deam foundation

1808


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1219


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1335






pls give me ans to ACT formula cube testing porpuse

2538


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1710


I what know about life time of frp tank plz explain about it specifications & other details

1792


natucher of concrete &type of concrete?

1901


significance of specific surface area of particles?

1789


What are the techniques to measure road difference?

758


how to tie 10 legged stirrups

5894


What is the Roll of Water Bonding under VDF road?

2122


How did street originate in the plumbing term street ell?

629


What is meaning of tlc

1599