HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC
METER.
Answer Posted / naresh
.95 m/m, .68 f/m, .27 bh, .05 first class mason, .05 second
class mason, .04 mason assistant for upto 2nd floor
Is This Answer Correct ? | 22 Yes | 10 No |
Post New Answer View All Answers
How to find out kg per Sft ?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
what is pile and deam foundation
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
pls give me ans to ACT formula cube testing porpuse
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I what know about life time of frp tank plz explain about it specifications & other details
natucher of concrete &type of concrete?
significance of specific surface area of particles?
What are the techniques to measure road difference?
how to tie 10 legged stirrups
What is the Roll of Water Bonding under VDF road?
How did street originate in the plumbing term street ell?
What is meaning of tlc