Answer Posted / mahendran b
Plate load test is carried out in pilling work. After
piling is done it has to tested according to desigin load.
The method for this test is called plate load test. Some
wights (only concrete, not use in sand bags) are kept on pile via plate
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What is meant by dimensioning?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
what is the clear cover for shearwall?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What is the tallest man made structure in the world?
what is tension footing?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
What is Curtailing of R/F
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is the sugested procedure of water purification for public supply?
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
How do You Maintain a structure after getting cube test of low strength.