How we can calculate what type of supply we need for an
example sometimes we take 11 KV and sometime 33KV from EB ?

Answer Posted / ghost

first of all these two numbers you mentioned - which are
11kV and 33kV - are not for supplying, they are for
transmitting the electricity from the power plant to the
utilities (homes) fr the purpose of reducing the losses.

Secondly, we use only either 120V or 240V depending on the
frequency that the country use which is 60 Hz or 50 Hz
respectively.

regards,,,

Is This Answer Correct ?    7 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What happen in ups if phase reverse?

1694


what are the dimensions for 200 kva transformer plinth (plateform),in which pcc m20 is used..

10783


hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.

1522


.php|

1728


draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words

22140






How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...

1489


difference between semiconductor & conductor & insulator?

1885


What are the uses of stepper motor?

725


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1493


For R-L or R-C ckt,time constant formula is L/R and RC respectively and its unit is in sec.Pls tell me the derivation

2688


how we can adjust for three phase motor cold stall time ,hot stall time and thermal register set up?

2515


Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.

1601


What is the method of estamating of cable, CB,MCB ?

1680


Can I use distributon class/transmission class Lightning arresots for protecting the building? If not why please explain?

1428


why chock were used in old tubelights but are not newest tubelights?

1455