9*9m 1:4:8 ratio using what quantity of 40mm aggregate,
sand&cement please tell anwser
Answer Posted / bong/mustafa
for the above given question the answer is
9x9x0.40 = 32.4
the given ratio = 1:4:8
1x32=33 bags
4x32=130 bags
Is This Answer Correct ? | 0 Yes | 28 No |
Post New Answer View All Answers
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
Why reinforcement done in shorter span in two way slabs
What is the origin of name railway sleepers?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how do we design mix ratio?
What things architect have to take care of before starting any project?
What is meant by cartesian coordinate system?
how many litres of enamel paint required for 5000 sft of site??
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.