Answer Posted / amit kumar
PID is Proportional Derivative and Intergral. These are used
in the control system and are the heart of any controller.
Depending upon control system requirement the values of P, I
and D are defines. P is proportional gain and normally used
when we require accurate or continuous control action. I is
integral time and is used to remove the offset. D is
derivative time and is used to to make the control system
stable.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
difference between main metering kiosk and check metering kiosk
What is the main cause of magnetism?
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
ACB & VCB how do work and saftes and how can maintenance in this and parts name show with picture
how to discharge 3 phase power factor correction capacitors
Please, if 1kw is equal to 1.25kva; how then do I know how many kva in 7.5kw?
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
What is mason's gain formula?
WE know that for Inductor X=2pifL,In DC f=0,then X=0 so,V=IX=0;But In the DC excitation of rotor of AC generator,DC motor field coil which coils are inductor so why does not applying DC voltage short the rotor coil of AC generator and field coil of motor?If it would then DC source might be damaged but it is not happened. Why does the strand conductor of Electrical power transmission line make twist?
how to test and calculat the head and discharge in borewell compressor
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?
what is difference between cpp electrical system and refinery electrical system
write a program that prints prime numbers from 1-20 in digonal form
what is mean by transition resistance of transformer?