Answer Posted / rajkumar s
(dia)^2/162
Is This Answer Correct ? | 96 Yes | 4 No |
Post New Answer View All Answers
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
Concrete cover for slab, column, beam and footing?
How to make tiles floor step by step procedure?
silt%= silt volume/ silt+sand volume is this right?
What does civil engineering mean?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is the distance between railway tracks?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
can any one explain bar bending schedule of bems and columns and slabs ??
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Describe the sections included in a typical bill of quantities
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the Hardness of M-40 grade concrete, general and theoratical
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?