Answer Posted / praveen.b.b
hai praveen .......... actually my name s also praveen.b.b.... thank u for ur answer... man i am BE electrical engineer july 2009 passed out.. if u know any job vacancies related to my field pls inform .. my id is praveenbb175@rediffmail.com................mob no. 9164518023
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
we have one oven for 12 zone we are installed ir lamp in oven we control load from thyrister and 0 to 5vdc so our zone no 8 getting bright in fraction of second so what we do.. Please answer
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
How it can worked plc based electrical system And which type of software using.
Differentiate between digital phase converter and ordinary phase converter.
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
3- What is the target from Zero Impedance, Single Phase Imp., S/C Imp. and magnetic balance tests?
what do you mean by every IC 74 first digit.why are you using this no.why not using another no.
In Electrical 'Single Line Diagram' cable nomenclature shows "2 X 1C X 630sq.mm to be provided for one incomer. The question is how many cable to be proved for one Incomer.
How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.
What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance
WHAT IS ELECTRICAL MAINTAINTENCE ?
Define active filter?
difference between main metering kiosk and check metering kiosk
What is superposition theorem?
When steam condenses and becomes water at the same temperature, the specific heat for the process in kJ/kg k is