Answer Posted / sunil kumar
Slump test is basically used for determine the workablity of
concrete. It give the idea aboout how easily can be placed ,
transport and compact the concrete.
| Is This Answer Correct ? | 34 Yes | 0 No |
Post New Answer View All Answers
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Who name us Engineer & Why?
How to find permissible diagonal tensile stress in reinforced brick work
what is the weight of 6000 psi concrete in lb/cft?
what is the service corridor?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
importance of the soundness test to determine the quality of cement use for any construction
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.