Name the standard sand for concrete tests

Answer Posted / mahesh

ENNORE

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

States some of the tool bars used in cad?

678


what radial pressure, the NP2 class rcc pipe can sustain?

2895


What is the density of DLC & PQC and how it is differ from normal concrete?

3020


what is the difference between replacement of cement by groundnut shell ash

2514


need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS

1425






Does VDF add strength to the flooring apart from preventing water ingress?

1069


What ingredients with% found in ppc cement??

1599


What is proportion of PCC Grade G?

1602


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1238


What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?

1399


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

1628


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1645


Why was the empire state building made of steel?

683


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1678


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1371