Answer Posted / anil kumar patro
IS Means INDIAN STANDARD
Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
What is the zero value in quantity surveying
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
pls mail some more tecnical qustions at msaranya2610@gmail.com
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What is the Roll of Water Bonding under VDF road?
pls give me some basic informations in construction of a structure?
Explain the advantages and disadvantages of using plastic and timber fenders?
How to cal. The weight of hollow pipe?
Describe the role of independent Quantity surveyor?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What does a construction cost covers and what does not?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
What are some structures that may be subjected to fatigue?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?