If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D
lap length which dia.should I consider for lapping

Answer Posted / nanthakumar.c

AS IS CODE WHICH EVER THE GREATER DIA OR 48 D WHICH IS
HIGHER

Is This Answer Correct ?    18 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the largest concrete dam in the world?

692


Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

1174


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1132


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1671


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1495






why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10225


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

5562


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1514


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

1565


what is the types of surveying?which type of survey carrying for type of work?

1677


What is meaning of tlc

1602


why the openings of sieves are square io size?

1099


Gidc technical que paper

1260


Where is the worlds longest elevator and how long is it?

697


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

700