Answer Posted / ajaya kumar rana
BOQ is a document used in tendering in construction
industry, which indicates quantities of various
works.Tenderer has to quote rates against given items in
BOQ. Rate should include cost of materials, machineries &
labours required to do that work.
Is This Answer Correct ? | 20 Yes | 2 No |
Post New Answer View All Answers
What is the cemnent ratio
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
what's the formula for calculate pcc for matt(45mm aggregate)?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
How to build the floor to ceiling bookcase?
What are the techniques to measure road difference?
how lap length is increased with increase of Grade of steel?
Why nautical mile is different from statute mile?
What is the difference between tor steel and tmt steel?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
how to calculate spacing rod in column
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What is the standard volume of pharma in cub ft
what is Short bored pile foundation.