Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Two types of piling

Answer Posted / nravindran

1.Friction pile
2.End bearing pile

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What applicable rate of wct in bihar

1850


How will be cutting in timber plate size 600*400 column size

1818


Floor tile measurement? Wall to wall or skirting to skirting

1848


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1641


How to calculate material and labor required for 100 m2 plaster?

1853


Differentiate orthographic and isometric projections?

1251


for pretensioning which will yield first and same for post tensioning?

2272


What are the alternate material for steel, Sand and aggregate

2386


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1708


What is meant by cad?

1045


How to arrive d*d/162 , for finding the kg per meter , wt of steel

1889


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2766


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2048


What is different between DI Pipe and CI pipe?

2161


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3053