Answer Posted / yashwanth kumar.k
under rimed, and end bearing.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how we check the thickness and line of ceiling plaster.
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Form where IS456 is adopted in 1978?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
What is difference between limit state and working stress method? How it is applies in building structure.
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
How can I make justification between using concrete grade c35 compare c37?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What is a kip?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
What are the advantages of cad software’s?
how to shuttering is used in slab