Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How can we find out the weight of metal sheet with the help of
its dimensions.

Answer Posted / subrahmanyam (nb ventures)

length*width*thicknees*7.85

Is This Answer Correct ?    9 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is mean by Hydraulic Overload in presses

2096


can someone explain tolerances on bolts what the symbols mean

2248


What are the items to inspect after cylinder liner is pulled out

1939


What are the assumptions made in simple theory of bending?

1129


why have u choose this ME-engg design department

2115


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1815


What is isotropic material ?

1117


Define Grashof number and its significance?

1184


what are the parameters are selected while manufacturing a single cylinder block?what are the different kind of test is conducted on it so that it can withstand with all those condition which required to run the engine efficiently.which force is act when piston slide inside the cylinder.

2025


There is a block placed in between air and water. water is at 100 deg cel and air at 50. 1) Draw temperature profile. 2) Why is it curve in air and water?

1362


How to check the round duct measurement

1176


what is the techanical difference between german standard & japanese standard.

2084


with the aid of schematic and block diagram describe the control system involved in a student passing a control system engineering examination.use standard terminologies and specify all the system component involved.

2256


Can we add different application (program)in pro e modelling software? If YES ,then how????????

1872


How much calorific value of heat is needed to heat 00c of

1912