Whats meant by trivector meter where it is connected at the
substation?
Answer Posted / ashraf
As the name suggests it is an electronic meter which is
used to measure the KWH,KVAH & KVARH.
it was originaly designed to measure the apparent power,
reactive power & active power. But now a days modern
trivector meter can also measure the power factor,
frequency & other electrical parameters in addition to
these three.
may be instaaled at HV or LV side, input/output side of
power transformer so that the consumption of energy can be
measured.
Is This Answer Correct ? | 15 Yes | 6 No |
Post New Answer View All Answers
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?
Does all the output contacts (N/O as well as N/C) of a Numerical relay operate when relay receives a binary input/inputs or contacts are designated to specific logic input/inputs and only these contacts operate?
description with working of all parts of a Diesel generator???????
Does the direction of rotation of d.c. Shunt motor would get reversed if the armature current and field current both are reversed?
Define stepper motor. What is the use of stepper motor?
Can i replace Earth leakage relay to the faulty Earth Faulty Relay
what's the exact magnitude of current, flows through Neutral?
Why efficiency in thermal power plant is low?
how to select the mpcbs and contactor for 3 phase 30 hp star delta motors.for plc control.and tell me the calaculation for future use.
how to calculate transformer turn primary & secondary side 11kv to 420v
hi frnds can any one help me ? plz send me placement paper of IOCL of Electrical streem .... plz send ....its urgent....
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
WHY IS THE EARTH FAULT CURRENT ALWAYS LESS THAN THE NORMAL CURRENT??
Sir, I m 3rd year student 4m DCE and want to do internship in siemens or l&t or any other mnc related to electrical engineering. please tell me the procedure 4 same and oblige me