is load combination is necessary in staad pro design
Answer Posted / om prakash narayan
fffdldl
for Staad pro
Load Combination 2 1.5(DL+LL)
| Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
What is the use of mirror command?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
how i convert mm into standard wire guage (SWG)no.
How many types of slabs are there & how to design it?
cement and sand required for one block of size 0.23*0.15*0.46
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How to marking the building
how to control PQI (Project Quality Index)
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
how to caliculate required amount of cement and sand required for 1cu.m.
How to calculate canal slope curvature qty!
How to calculate sand , cement quantity for 23mm thk brick work(10x10)