how the lap length is calculated in reinforcement of 110mm
dia steel of Length 15.00 mtrs. & grade of concrete is M20
Answer Posted / rammy
Lap Length is equal to
50D for Tension zone : 50*10 =500 mm
45D for compression zone : 45*10 =450 mm
| Is This Answer Correct ? | 84 Yes | 23 No |
Post New Answer View All Answers
how to clculate the %of concrete strenght achive after curing?load
how much one carpenter can doing shuttering of slab in one day
what mean By core Billing
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What does civil engineering mean?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Define Workability ?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What is costing in 100squre feet bricks
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is labor and material payment bond?
Explain the different types of building contracts?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required